Skip to content
RDL
Network
Ecosystem
Switch app
TR
About
FAQ
Sign in
Get started
Closure to “Construction Scheduling and Progress Control Using Geographical Information Systems” by Stephen E. Poku and David Arditi — Stephen E. Poku (2007) | RDL Network
Back
Cite
Save
Save for later
Share
Home
Publications
Closure to “Construction Scheduling and Progress Control Using Geographical Information Systems” by Stephen E. Poku and David Arditi
Shared by
David Arditi
Illinois Institute of Technology
Closure to “Construction Scheduling and Progress Control Using Geographical Information Systems” by Stephen E. Poku and David Arditi
Article
2007
en
Authors
SP
Stephen E. Poku
David Arditi
Illinois Institute of Technology
Discussion
(0)
Sign in
to like and join the discussion.
No comments yet. Be the first to comment.
Related publications
Article
2007
Closure of "Construction Scheduling and Progress Control using Geographical Information Systems"
Stephen E. Poku
,
David Arditi
Article
2006
Construction Scheduling and Progress Control Using Geographical Information Systems
Stephen E. Poku
,
David Arditi
Article
2004
Closure to “Constructability Analysis in the Design Firm” by David Arditi, Ahmed Elhassan, and Y. Cengiz Toklu
David Arditi
,
Ahmed Elhassan
,
Yusuf Cengiz Toklu
Article
1991
Closure to “ <i>Impact Analysis of Owner‐Directed Acceleration</i> ” by David Arditi and Bhupendra K. Patel (March, 1989, Vol. 115, No. 1)
David Arditi
Article
1996
Closure to “Reliability of Underground Pipelines Subject to Corrosion” by M. Ahammed and R. E. Melchers
M. Ahammed
,
Robert Melchers
Journal of Transportation Engineering
Discussion(0)
No comments yet. Be the first to comment.