Skip to content
RDL
Network
Ecosystem
Switch app
TR
About
FAQ
Sign in
Get started
Closure of "Construction Scheduling and Progress Control using Geographical Information Systems" — Stephen E. Poku (2007) | RDL Network
Back
Cite
Save
Save for later
Share
Home
Publications
Closure of "Construction Scheduling and Progress Control using Geographical Information Systems"
Shared by
David Arditi
Illinois Institute of Technology
Closure of "Construction Scheduling and Progress Control using Geographical Information Systems"
Article
2007
en
Authors
SP
Stephen E. Poku
David Arditi
Illinois Institute of Technology
Discussion
(0)
Sign in
to like and join the discussion.
No comments yet. Be the first to comment.
Related publications
Article
2006
Construction Scheduling and Progress Control Using Geographical Information Systems
Stephen E. Poku
,
David Arditi
Article
2007
Closure to “Construction Scheduling and Progress Control Using Geographical Information Systems” by Stephen E. Poku and David Arditi
Stephen E. Poku
,
David Arditi
Article
2020
Advanced Progress Control of Infrastructure Construction Projects Using Terrestrial Laser Scanning Technology
Chengyi Zhang
,
David Arditi
Preprint
1994
From Conventional to Knowledge Based Geographical Information Systems
Manfred M. Fischer
Preprint
1994
From Conventional to Knowledge Based Geographical Information Systems
Manfred M. Fischer
RePEc: Research Papers in Economics
Discussion(0)
No comments yet. Be the first to comment.