From October 2008 through September 2011, a coalition of business, academia and public sector partners completed a distributed generation demonstration in Fort Collins, Colorado under the US Department of Energy's Renewable and Distributed Systems Integration (RDSI) program. The project achieved its primary goals, albeit operating during a demonstration period that was reduced in length from the original proposal. Many of the most significant challenges, and resulting learning, derived from non-technical, economic, political and legal issues which were not directly anticipated in the original project submission.
Continuous emission monitoring (CM) solutions promise to accelerate fugitive methane emission mitigation in natural gas infrastructure by detecting large sources sooner than they would be detected in traditional leak surveys. Quantification by CM solutions has also been proposed as the foundation of measurement-based inventories. Herein we present the first published results of CM solutions tested using a consensus protocol. Single-blind testing was performed with controlled releases at a dedicated facility, using test conditions that were challenging but less complex than typical field conditions. Eleven solutions were tested, including point sensor networks and scanning/imaging solutions. Results indicate detection limits (emission rate with 90% probability of detection) of 3-30 kg CH4/h, with 6 of 11 solutions in the range of 3-6 kg CH4/h, with high uncertainty. Of the 11 solutions tested, 6 provided emission rates estimates and for emission rate of 0.1-1 kg/h, the solutions' mean relative errors ranged from -44% to +586% with single estimates between -90% and +300% (all uncertainties stated as empirical 95% confidence intervals) with most solutions' upper uncertainty exceeding +900%. Solutions' mean relative error for emission rates >1 kg/h is -40% to +93% with two solutions achieving mean relative errors below 20%. In this range, all solutions exhibited single-estimate relative error from below -80% to values above +240%. When test results were simulated using emissions data from a portfolio of facilities, two solutions estimated emissions to within ±20%, while 4 estimated emissions at least double the true emission rate. The large variability in performance between CM solutions, coupled with highly uncertain detection, detection limit, and quantification results, indicate that the performance of individual CM solutions should be well understood before relying on results for internal emissions mitigation programs or regulatory reporting. Additionally, given the rapid development of these solutions, additional implementation standards and regular testing will also be necessary.
Authors are from: Energy Institute at Colorado State University, Fort Collins, Colorado, USA, AECOM, Austin, Texas, USA, SLR International Corporation, New Braunfels, Texas, USA, Mechanical Engineering, Colorado State University, Fort Collins, Colorado, USA, Fort Lewis College, Durango, Colorado, USA, and University of Texas, Austin, Texas, USA.
Authors are from: Energy Institute at Colorado State University, AECOM, SLR Consulting, Fort Lewis College, and University of Texas, Austin, Texas, USA.
Gathering pipelines, which transport gas from well pads to downstream processing, are a sector of the natural gas supply chain for which little measured methane emissions data are available. This study performed leak detection and measurement on 96 km of gathering pipeline and the associated 56 pigging facilities and 39 block valves. The study found one underground leak accounting for 83% (4.0 kg CH4/hr) of total measured emissions. Methane emissions for the 4684 km of gathering pipeline in the study area were estimated at 402 kg CH4/hr [95 to 1065 kg CH4/hr, 95% CI], or 1% [0.2% to 2.6%] of all methane emissions measured during a prior aircraft study of the same area. Emissions estimated by this study fall within the uncertainty range of emissions estimated using emission factors from EPA’s 2015 Greenhouse Inventory and study activity estimates. While EPA’s current inventory is based upon emission factors from distribution mains measured in the 1990s, this study indicates that using emission factors from more recent distribution studies could significantly underestimate emissions from gathering pipelines. To guide broader studies of pipeline emissions, we also estimate the fraction of the pipeline length within a basin that must be measured to constrain uncertainty of pipeline emissions estimates to within 1% of total basin emissions. The study provides both substantial insight into the mix of emission sources and guidance for future gathering pipeline studies, but since measurements were made in a single basin, the results are not sufficiently representative to provide methane emission factors at the regional or national level.
The West Africa Power Pool (WAPP) Interconnected Transmission System (WAPPITS) has faced challenges with frequency control due to limited primary frequency control reserves (PFRs). Battery Energy Storage Systems (BESSs) have been identified as a possible solution to address frequency control challenges and to support growing levels of variable renewable energy in the WAPPITS. This paper uses a dynamic PSS/E grid simulation to evaluate the effectiveness of BESSs and conventional power plants for the maximum N-1 contingency scenario in WAPPITS—the loss of 400 MW of generation. BESSs outperform conventional power plants in fast frequency response; a BESS-only PFR mix produces the best technical performance for the metrics analyzed. However, this approach does not have the best marginal cost; a balanced mix of BESSs and conventional reserves achieves adequate performance on all metrics to meet grid requirements. This hybrid approach combines BESSs’ rapid power injection with the lower cost of conventional units, resulting in improved nadir frequencies (e.g., 49.70–49.76 Hz), faster settling times (1.00–2.20 s), and cost efficiency. The study indicates that an optimal approach to frequency control should include a combination of regulatory reforms and coordinated reserve procurement that includes BESS assets. Regulatory reforms should require or incentivize conventional plant to provide PFRs, possibly through creation of a (new to WAPPITS) market for ancillary services. While not a comprehensive analysis of all variables, these findings provide critical insights for policymakers and system operators.
Networked rural electrification can potentially improve energy resources utilization, reduce cost and enhance supply reliability. Identifying optimal connection paths is critical for proper network design. To overcome the inefficiency of applying standard A* path-finding method to complex topography, multiplier-accelerated A* (MAA*) algorithm, which utilizes a modified heuristic, has been developed in previous research. While MAA* can generally reduce computation time by ~90% at the cost of ~10% optimality, the computation burden can still be remarkable for some areas with intricate topological variations. This paper proposes an adaptive version of MAA*. By introducing intermediate nodes in MAA*, the new algorithm significantly simplifies computations in complex regions. This greatly facilitates the analysis and design of optimal network for cost-effective electricity supply to users in remote, difficult-to-reach areas.
Abstract The Rift Valley region of Sub-Saharan Africa represents a promising area for the development of small (<5MW) hydropower resources. This study compiles data from government and UN agency reports to analyze different development outlooks. The study found that there has been a rapid deployment of small hydropower in the last 10 years. From the current total deployed small hydro of 47.5 MW, 16.5MW (35%) were deployed from 1957 to 1984 while the remaining 31 MW (65%) were deployed from 2007 to 2017. While all systems constructed prior to 1985 are grid-connected, one third of the 24 facilities constructed after 2007 are connected to off-grid systems. The study provides an overview of the economic incentives for developing small hydropower systems in Rwanda and the potential contribution of that development to Rwanda’s electrification goals.