Skip to content
RDL
Network
Ecosystem
Switch app
TR
About
FAQ
Sign in
Get started
Solving energy-efficient fuzzy hybrid flow-shop scheduling problem at a variable machine speed using an extended NSGA-II — Yi-Jian Wang (2023) | RDL Network
Back
Cite
Save
Save for later
Share
Home
Publications
Solving energy-efficient fuzzy hybrid flow-shop scheduling problem at a variable machine speed using an extended NSGA-II
Shared by
Witold Pedrycz
University of Alberta
Solving energy-efficient fuzzy hybrid flow-shop scheduling problem at a variable machine speed using an extended NSGA-II
Article
2023
en
Authors
+2 more
YW
Yi-Jian Wang
GW
Gai‐Ge Wang
FT
Fang-Ming Tian
Discussion
(0)
Sign in
to like and join the discussion.
No comments yet. Be the first to comment.
Related publications
Article
2022
Solving Multiobjective Fuzzy Job-Shop Scheduling Problem by a Hybrid Adaptive Differential Evolution Algorithm
Gai‐Ge Wang
,
Da Gao
,
Witold Pedrycz
Article
2020
Solving Fuzzy Job-Shop Scheduling Problem Using DE Algorithm Improved by a Selection Mechanism
Da Gao
,
Gai‐Ge Wang
,
Witold Pedrycz
Article
2023
Variable Reduction Strategy Integrated Variable Neighborhood Search and NSGA-II Hybrid Algorithm for Emergency Material Scheduling
Guohua Wu
,
Witold Pedrycz
,
Zhen Shu
,
Aijuan Song
Article
2022
Application of job shop scheduling approach in green patient flow optimization using a hybrid swarm intelligence
Masoumeh Vali
,
Khodakaram Salimifard
,
Amir Gandomi
,
Thierry Chaussalet
Computers & Industrial Engineering
Article
2024
Energy-Efficient Satellite Range Scheduling Using a Reinforcement Learning-Based Memetic Algorithm
Yanjie Song
,
Ponnuthurai Nagaratnam Suganthan
,
Witold Pedrycz
,
Ran Yan
,
Dongming Fan
,
Yue Zhang
Discussion(0)
No comments yet. Be the first to comment.