Abstract
1 min readGiven the geological conditions and design requirements of the east breakwater in a coastal city, the breakwater adopts the blasting and extrusion silt for foundation treatment, and the problem of instability occurs during the treatment of blasting and extruding the silt foundation, and the restoration measures are studied. Combined with the construction process, the blasting and extruding dredging embankment is introduced due to construction problems, which leads to the failure of the bottom, the instability of the embankment, and the displacement accident, the causes of the accident are analyzed, and the main repair measures taken after the destabilization of the blasting and extrusion dredging embankment are introduced in detail, which provides a reference method for similar projects in the future.