Skip to content
RDL
Network
Ekosistem
Uygulama değiştir
EN
Hakkımızda
SSS
Giriş yap
Başla
Hybrid ensemble paradigms for estimating tunnel boring machine penetration rate for the 10-km long Bahce-Nurdagi twin tunnels — Abidhan Bardhan (2024) | RDL Network
Back
Cite
Save
Save for later
Share
Home
Publications
Hybrid ensemble paradigms for estimating tunnel boring machine penetration rate for the 10-km long Bahce-Nurdagi twin tunnels
Shared by
Panagiotis Asteris
Hybrid ensemble paradigms for estimating tunnel boring machine penetration rate for the 10-km long Bahce-Nurdagi twin tunnels
Article
2024
Authors
+1 more
AB
Abidhan Bardhan
NÖ
Nazlı Tunar Özcan
Panagiotis Asteris
Discussion
(0)
Sign in
to like and join the discussion.
No comments yet. Be the first to comment.
Related publications
Article
2019
Supervised Machine Learning Techniques to the Prediction of Tunnel Boring Machine Penetration Rate
Hai Xu
,
Jian Zhou
,
Panagiotis Asteris
,
Danial Jahed Armaghani
,
Mahmood Md. Tahir
Article
2024
Innovative hybrid machine learning models for estimating the compressive strength of copper mine tailings concrete
Mana Alyami
,
Kennedy C. Onyelowe
,
Ali Alateah
,
Turki S. Alahmari
,
Ali Alsubeai
,
Irfan Ullah
,
Muhammad Faisal Javed
Article
2024
Tree-Based Solution Frameworks for Predicting Tunnel Boring Machine Performance Using Rock Mass and Material Properties
Danial Jahed Armaghani
,
Zida Liu
,
Hadi Khabbaz
,
Hadi Fattahi
,
Diyuan Li
,
Mohammad Afrazi
Article
2025
Numerical investigation on the responses of existing water diversion tunnel induced by under-crossing twin tunnels considering the lagging distance
Zhi Li
,
Xiaojie Zhu
,
Hui Jin
,
Hao Wang
Article
2021
Three-Dimensional Modeling and Analysis of Mechanized Excavation for Tunnel Boring Machines
Danial Mohammadzadeh S.
,
Nader Karballaeezadeh
,
Amirhossein Sanaei Zahed
,
Amir Mosavi
,
Felde Imre
Acta Polytechnica Hungarica
Discussion(0)
No comments yet. Be the first to comment.