Skip to content
RDL
Network
Ekosistem
Uygulama değiştir
EN
Hakkımızda
SSS
Giriş yap
Başla
CFRP–Cable-Stayed Bridge Hybrid with Partial Suspension and a Span Exceeding 3,000 m: Concept, Optimization, and Construction — Li Min Dong (2025) | RDL Network
Back
Cite
Save
Save for later
Share
Home
Publications
CFRP–Cable-Stayed Bridge Hybrid with Partial Suspension and a Span Exceeding 3,000 m: Concept, Optimization, and Construction
Shared by
Peng Feng
Tsinghua University
CFRP–Cable-Stayed Bridge Hybrid with Partial Suspension and a Span Exceeding 3,000 m: Concept, Optimization, and Construction
Article
2025
en
Authors
LD
Li Min Dong
Peng Feng
Tsinghua University
Discussion
(0)
Sign in
to like and join the discussion.
No comments yet. Be the first to comment.
Related publications
Article
2018
Monitored structural behavior of a long span cable-stayed bridge under environmental effects
Alemdar Bayraktar
,
Ashraf Ashour
,
H. Karadeniz
,
Altok Kurşun
,
Arif Erdiş
Article
2017
Static and dynamic field load testing of the long span Nissibi cable-stayed bridge
Alemdar Bayraktar
,
Temel Türker
,
Janusz Tadla
,
Altok Kurşun
,
Arif Erdiş
Article
2022
Final-State Structural Behavior of the Long-Span Kömürhan Cable-Stayed Bridge under Torsional and Bending Loadings
Alemdar Bayraktar
,
Arif Erdiş
,
Altok Kurşun
,
Yavuzhan Taş
,
Taha Özdilek
Article
2011
Theoretical and Experimental Study on Cable-to-Irder Anchorages in Long-Span Cable-Stayed Bridges with Steel Box Girder
Xing Wei
,
Jun Li
Article
2010
Stochastic finite element analysis of a cable-stayed bridge system with varying material properties
Özlem Çavdar
,
Alemdar Bayraktar
,
Süleyman Adanur
Discussion(0)
No comments yet. Be the first to comment.